Tuesday, 26 February 2008
Work is progressing at a fair speed now. Much faster than I had ever hoped.







It is so wonderful that it now looks like a house and I can see light at the end of the tunnel. An end to caravan living. What will we do with all that space - fill it very quickly I should imagine lol
The timber frames were all stuffed with lots of insulation slab.
You can get a better idea of the size of the kitchen now that the dry lining walls are in place.
Phil is trying to make himself feel at home in the lounge. He only really sees progress at weekends because at this time of year he leaves home in the dark and it is dark again before he returns at night.
The wall is up now that divides the plant room, which contains all the manifolds and tanks etc for the geothermal and underfloor heating
The wiring has all been run to where it needs to be. Parts of the walls look like spaghetti junction. I think there are 800 metres of wire altogether, plus the telephone wire and coax for TV and satellite. So probably 1,000 metres of wiring altogether. I had the builders amazed at how many sockets I wanted. But decided that never again do I want to have "Xmas trees" of socket adapters.
We also decided to future proof as much as we could and so have installed a TV point and telephone point in every room. We won't need them, but someone may do in the future.
The plasterboard is done in a few of the rooms now
The pink plasterboard is fire -retardent for the corner where the wood burning stove will be fitted. The stove is mainly for emergency use as the underfloor heating will provide most of the heating needed. But since we get quite a lot of power cuts in winter and seem to be fairly low down the list of priorities for repair, we decided that if we can keep one room warm it will make life much easier.
Friday, 8 February 2008
We have had one or two problems in the last couple of days - some of which have been resolved.

The gap between the wall tops and the roof was quite large in places because of the uneven granite walls
This has been filled with many tons of mortar.
The gable end was leaking quite badly in the kitchen
The leak was traced to a crack in the pointing just above the granite lintel. The whole gable has been repointed and hopefully the leak will have stopped.
There has also been a hitch with the piping for the under-floor heating. I think that when the piping was put in, on a freezing cold December day. The workers just wanted to get the job finished and go back to their families. The pies stand away from the wall by 200mm. This is making it difficult to box round them with the dry lining wall.
You cannot imagine how terrifying it is to find the workers attacking the concrete around the pipes with a heavy duty hammer drill with chisel on.
The final problem has not been resolved yet and might be one that I have to learn to live with.The door handle in the opening bedroom door/window is ludicrously low. I am unsure as to whether the door has been put on upside down or not.
The good news is that the floor for the study is in.
This has actually led to a change of bedroom for me and Phil. We were gouing to use the upstairs bedroom as ours because of the spectacular views down towards the fisheries. The walls are higher than we had imagined and this is the spectacular view that I get.
The "Bridge is now in place linking the study and the upstairs bedroom and the first of the insulation is in.
Tuesday, 5 February 2008
There has been a long period with no builders working. But we are making progress again.