The long side of the lounge block is now completed
The sunpipe in that section of roof is in place as well. This should provide extra light towards the rear of the upstairs bedroom which is located in that hipped section of roof.
The study roof is complete as well
The roof is now looking great when viewed from the North
The only work to be done now is the small amount of slating seen on the following picture and the ridge tiles on some sections of roof.
Kenny's mean machine arrived on site today. It is most impressive when you stand next to it, I hadn't realised quite how much bigger than our humble digger it actually was. Work will start in the morning digging out the enormous hole for the slinky piping which will collect the heat for the geothermal heating system.