The slates have made some progress but they had to stop before the ridge because the paper needs to lap from one side to the other.
The paper has been put onto most of the third roof side today so presumable the next step will be the lead gutters. There will be three altogether on this section because there are two valley gutters which meet at the end of a trough between two parallel roof sections.
No comments:
Post a Comment